Skip to content
BUILTWISECONSTRUCTION

Manufacturing Facilities in Fraser Coast

The Fraser Coast is becoming a manufacturing region. The Queensland Train Manufacturing Program is building 65 six-car passenger trains at a purpose-built facility at Torbanlea, operational in 2026, whose main manufacturing building has a floor plan of 30,650 m² with a commissioning track and a rail connection to the North Coast line. Suppliers and service businesses need buildings nearby.

What Fraser Coast means for your manufacturing project

Two design checks stand out here. Indicative wind mapping places Maryborough and Hervey Bay in Region B1 while Bundaberg, to the north, is in cyclonic Region C, so the engineer confirms the wind region from AS/NZS 1170.2 for every site. And Maryborough's weather station records a mean annual rainfall of 1,143.7 mm, which drives roof drainage and site stormwater design under the Fraser Coast Planning Scheme 2014.

Planning and site schedule: Fraser Coast

Planning and site information for Fraser Coast
CouncilFraser Coast Regional Council
Planning schemeFraser Coast Planning Scheme 2014 (commenced 28 January 2014)
Industrial areas
  • Queensland Train Manufacturing Program facility, Torbanlea: State train factory near Maryborough off the Bruce Highway with a rail connection to the North Coast Line
Nearest Builtwise officeabout 225 km straight line from the Crowley Vale head office

Design checklist

Process flow
Building shape and doors set by the production line and material movement.
Utilities
Power, air, water, gas and extraction planned with space and structural support.
Floor
Slab for machinery loads, with joints, falls and finishes suited to the process.
Hygiene and wash-down
Finishes and drainage for food or clean processes where required.
Fire and hazards
Sprinkler triggers and hazardous goods requirements identified early.

Full manufacturing facilities guide

Concept visualisation of a high-bay light manufacturing facility interior with racking, work benches and floor markings
A high-bay light manufacturing facility interior with racking, work benches and floor markingsConcept image

Manufacturing in Fraser Coast: questions

Is the Fraser Coast in a cyclone wind region?

Geoscience Australia's indicative dataset places Maryborough and Hervey Bay in Region B1 and Bundaberg in cyclonic Region C. Because the boundary is close and the dataset is not for design, the project engineer confirms the region for each site.

Can you build a factory with offices at the front?

Yes. A Class 8 production area with an attached Class 5 office and amenities is a common combination; each part meets the requirements for its class.

Price your manufacturing project in Fraser Coast

Send the lot address, the rough size and what the building is for. We check the zoning and approval pathway, suggest the structure that suits and come back with a budget range.

Monday to Friday, 8 am to 5 pm (AEST). Brisbane office visits by appointment.

Start your project quote

Step 1/3

  1. 01 Project
  2. 02 Details
  3. 03 Contact

Prefer to talk? Call 07 2142 1772

Call our teamRequest a quote